Project Management
The largest residential media facade in Ukraine

This landmark project involved the design, installation, and configuration of Ukraine's largest residential media facade, covering a total lighting area of 4,000 m². Our team provided end-to-end project management, ensuring seamless technical coordination between local engineers and Chinese manufacturers throughout execution.


Our approach
We assisted in finding the manufacturer, selecting components, engineering custom light source and aluminum mounting system schematics. To prevent technical misunderstandings, we established direct technical coordination with the Chinese engineering team, eliminating language barriers and miscommunications. We reviewed and adapted all architectural drawings, wiring schematics, and mounting details to ensure full compatibility between client requirements and production specifications. We provided continuous support for local engineers, converting the Chinese manufacturer's technical drawings and instructions into clear, structured project documentation. During installation and deployment, we guided the configuration and calibration processes, ensuring stable signal transmission and dynamic lighting synchronization across the entire system.
The challenge
The system had to be engineered to account for the architectural and technical features of the building, and also to prevent light from shining into residents' apartments. In addition, we had to meet exceptionally tight deadlines, as the media facade installation depended strictly on the schedules of general facade and electrical works. Because several works had to run in parallel, all required materials and components had to be available on-site precisely by strict target dates.

The execution
As a result of our work, the project was launched even slightly ahead of the planned schedule. All architectural and technical requirements of the client were strictly complied with. The launch was successful and as close to expectations as possible. Several minor issues during initial setup and calibration were resolved very quickly thanks to continuous communication with the Chinese engineers. The project became one of the calling cards of the entire city.


Measurable results
4,000 m²
Total media facade area
18,449
Individual light sources calibrated
20+ km
Cables laid
33 kW
Total power
ChinaGatePro provided continuous communication support with the Chinese engineers during the installation process, which helped avoid many errors and quickly launch the entire system.

*To protect our clients’ business secrets and supply chain confidentiality, the client’s name and company title have been anonymized.